Sustainable Process and Energy Creative Solutions (SPECS)
  • Home
  • Aim
  • Services
  • Contact Us
  • More
    • Home
    • Aim
    • Services
    • Contact Us
Sustainable Process and Energy Creative Solutions (SPECS)
  • Home
  • Aim
  • Services
  • Contact Us

Cost distribution of transformation

Recovery Period: 4 months to 1 year

The cost of upgrading a milk processing unit is influenced by several factors, with the size of the plant being a primary determinant. Different approaches and designs can be adopted, tailored to meet the specific needs of each facility. 


Our company provides a variety of enhancements options that align with your plant's unique requirements. While lower-cost revamp are available, they may yield fewer savings in the long term. 


After conducting an on-site visit, we design a modernization plan tailored specifically for your plant, taking into account its current arrangement. 


Major cost components typically include significant equipment such as heat exchangers, pumps, and compressors. Our bespoke solutions ensure that each overhaul maximizes efficiency and cost-effectiveness. It is a one time investment, on which you will save energy every year.


For example, modifying a dairy plant with a capacity of 2000 liters per hour with an investment of 10 lakh can lead to 100% fuel savings, eliminating boiler fuel costs and saving 30 lakh per year. Alternatively, a 5 lakh investment can achieve a 30% energy saving by reducing the boiler load.

Example of Milk processing unit

Unit Specs

Plant Capacity

10000 lit/h

liter per hour

Fuel Consumption

30 lakh

Lakh per year

Investment

10 lakh

One time Investment


After modification

Energy Saving

66%

Total plant

Boiler Fuel Saving

100%

Reduction in Demand

Load Shift on Electricity

33%

From Boiler

Emission reduction

100%

No Fuel

Payback Period

4 months

On Investment

Return on Investment

300%

per year

Notice: The values provided above are exemplary and may vary depending on the design of your plant.

Find Out how

Copyright © 2025 SPAREN ChemSPEC Solutions Pvt. Ltd. - All Rights Reserved. 

GSTIN: 08ABOCS7492J1ZY 

Powered by

  • Home
  • Aim
  • Services
  • Contact Us

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept